PROJECT NAME & DESCRIPTION LOCATION NAME OF CLIENT AND CONTACT PERSON CONTRACT PERIOD (WITH DATE) COMPLETION PERIOD (WITH DATE)
Construction of Earth Dam Fiditi, Oyo State Ogun-Oshun River Basin Development Authority Nov. 2011 To-date
Channelization of Lower Awba Stream University of Ibadan Zoological Garden University of Ibadan May 2012 To-date
Rehabilitation of Ogere Water Supply Scheme Ogere World Bank/Ogun State Water Corporation Oct. 2008 March 2012
Ajagunmolu Flood and Erosion Control Ijebu-Ode Federal Ministry of Environment Jan. 2011 To-date
Dredging of River Omi Ogungbade, Oyo State. Ministry of Environment & Habitat May 2012 June 2012
Dredging of River Ijaiye, Abiola Way, Quarry Road. Ogun State Ministry of Environment May 2012 June 2012
Construction of 32nos of Solar Powered Boreholes. Ogun State Ogun State Bureau of Management and Budget Nov. 2009 July 2010
Construction of 3nos of Solar Powered Boreholes. Ogun State Ogun-Oshun River Basin Development Authority Dec. 2009 April 2010
  • 24

    CLAY COMPACTION FOR COT (FIDITI DAM)

  • c22

    CLEARING OF RIVER COURSE (DOWN STREAM) (FIDITI DAM)

  • 34

    CLIENT INSPECTING PROGRESS OF WORK (FLOOD CONTROL SYSTEM) AT OGERE WATER SUPPLY SCHEME BY SATO ENGINEERING NIGERIA LIMITED

  • 23

    STONE PITCHING WORK (FLOOD CONTROL SYSTEM) IN PROGRESS AT OGERE WATER SUPPLY SCHEME BY SATO ENGINEERING NIGERIA LIMITED

  • e02

    EXCAVATION WORK (EROSION CONTROL) IN PROGRESS AT MABUNMI JUNCTION, IJEBU-ODE, OGUN STATE

  • 211

    DUCTILE IRON PIPES BEING OFFLOADED AT OGERE WATER SUPPLY SCHEME BY OUR CRANE LORRY

  • 22

    CONSTRUCTION WORK IN PROGRESS AT OGERE WATER SCHEME OGUN STATE

  • 1

    CONSTRUCTION WORK IN PROGRESS AT OGERE WATER SCHEME OGUN STATE

  • s4
  • s2

    LAYING OF DUCTILE IRON PIPE AT OGERE

  • ds2

    CONSTRUCTED OVERHEAD TANK AT OSHITELU MEMORIAL GRAMMAR SCHOOL AT OGERE

  • saas2

    FOUNDATION WORK FOR 253 M 3 OVERHEAD TANKS IN PROGRESS, OGERE, OGUN STATE

  • 3

    LAYING OF DUCTILE IRON PIPES IN PROGRESS AT OGERE

  • 2

    LAYING OF IRON DUCTILE PIPES IN PROGRESS AT OGERE

  • 92

    EXCAVATION OF TRENCH FOR PIPE LAYING IN PROGRESS AT OGERE

  • 62

    INSTALLATION OF HIGHLIFT PUMP IN PROGRESS AT OGERE

  • nhj

    REHABILITATION OF FILTER BED IN PROGRESS AT OGERE WATER SUPPLY SCHEME

  • c2

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE TUBE, OGUN STATE, MDG’S PROJECT.

  • 5

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE TUBE, OGUN STATE, MDG’S PROJECT.

  • w4

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE IDOGO, OGUN STATE, MDG’S PROJECT.

  • w3

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE IFOYINTEDO, OGUN STATE, MDG’S PROJECT.

  • w2

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE OTA, MDG’S PROJECT

  • w1

    COMPLETED SOLAR POWERED BOREHOLE PROJECT AT PRIMARY HEALTH CENTRE OTA, MDG’S PROJECT