Skip to content
Sato Engineering & Infrastructure Limited
Water

Channelization of Lower Awba Stream

Sato has been awarded contract for the channelization of the Lower Awba Stream at the University of Ibadan. The project is to put an end to the perennial flooding along the axis of the Awba Stream from the source to the Dam. The scope involves establishing horizontal alignment and setting out as designed excavating trench using profile levels and making good the excavation to receive concrete. Reinforcement bars of different sizes are to be bent and placed in line with project working drawings and concrete works to form the shape specified for the Channelization works.

Excavator clearing and channelling a stream through woodland
Stream channelization in progress

Project details

Client
University of Ibadan
Location
University of Ibadan Zoological Garden, Oyo State

Planning something similar?

Tell us the scope and we will show you comparable work and the team that would deliver it.